My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GeoSyntec Consultants 0 <br />• Inspecting soil stockpile and borrow areas. <br />• Inspecting synthetic materials, finished product specifications, and <br />manufacturer's test results. <br />• Checking receipt of all synthetic materials documentation required in the <br />specifications before synthetic materials are accepted. <br />• Observing transportation, unloading, handling, and storage procedures for the <br />synthetic materials for any damage that may occur; damaged synthetic materials <br />may be rejected. <br />Reviewing Contractor's proposed construction procedure for design and <br />specification compatibility. <br />5.2 Construction <br />5.2.1 General <br />The inspection activities of the CQA Team will include: <br />• Checking that materials are as specified or approved by the CQA Officer or <br />Design Engineer. <br />• Recording any damage to the compacted soil layers or synthetic materials <br />resulting from operation of equipment. <br />• Observing the phases of the construction and document the Contractor's <br />compliance or noncompliance with the approved plans, specifications, and the <br />directions of the CQA Officer. <br />• Monitoring to prevent equipment from damaging stored or deployed synthetic <br />materials by handling, trafficking, leakage, or other means. <br />• Monitoring to prevent people working on the synthetic materials from smoking, <br />wearing shoes that could damage the materials, or engaging in activities that <br />could damage the materials. <br />J:IALLIED\FORWARD\CLOSURE\REPORT\CQA REPORT 5-2 99.11.30 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.