07/28/99 Construction Field Report Job No. 986011.0', <br /> DFR No. 59 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 59 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan Jr. 7-28-99 Wednesday <br /> General Contractor: Liner Contractor: Prej. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows I William Geary <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clear Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total <br /> Guinn continues to import and spread the GDM with the D4M on the eastern and southern edge of the cell <br /> floor. Guinn continued to place vegetative cover material on the south slope of the Ashpit. Guinn placed <br /> material from the earthfill stockpile. The material from the leachate impoundment was found to be <br /> unsuitable for fill due to wooded debris in it. Guinn excavated the top 2' of the leachate impoundment and <br /> the material cleaned up. Guinn then placed the impoundment material for vegetative cover material. Guinn <br /> placed vegetative cover over the plywood on the southwest Ashpit anchor trench prior to placing the <br /> protective geotextile under the plywood. Allied had some rolls of geotextile in a storage locker that Guinn utilized <br /> for the protective layer at the anchor trenches. <br /> Vector Engineering,Inc. CQA did a walk through with Guinns foreman of the leachate impoundment area. <br /> Several pieces of firewood and several stumps were encountered. Guinn will place the material unsuitable <br /> for placement on the liner to the appropriate stockpile. Guinn will excavate the upper portion of the <br /> impoundment and check if the underlying material is suitable for vegetative cover. CQA observed placement <br /> and spreading of the vegetative material on the southern slope of the Ashpit. CQA informed Guinn that there <br /> is to be protective geotextile over the GDN and under the plywood at the anchor trench/geomembrane tie in <br /> points(Per Plans Note#9). CQA observed that 2 sandbags were under the geocomposite and needed to be <br /> removed. CQA informed Allied and they would like GSE to remove them when they come back to do the <br /> leachate pond. <br /> [File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />