07/29/99 Construction Field Report Job No. 986011.0, . <br /> DFR No. 60 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 60 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca, CA Butch Stefan/ Jr. 7-29-99 Thursda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows William Geary <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clear Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total <br /> Guinn continues to spread the vegetative cover material on the south slope of the Ashpit. Guinn started to <br /> place the bench material starting from the western edge of the l'bench to the south of cell WMU D-99. <br /> Guinn continues to utilize the material from the earthfill stockpile as vegetative and bench material. Guinn is <br /> excavating the leachate impoundment pond area and stockpiling the wooded material in Allieds stockpile. <br /> Vector Engineering,Inc. CQA observed excavation of the leachate pond area,placement of geotextile under <br /> the plywood on the western edge of the l�`bench,cover material placement on the l'`bench and placement <br /> of vegetative cover material. CQA observed that Guinn is leaving the sandbags in the V channel on the south <br /> of the Ashpit <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: v5 <br />