08/02/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 62 VECTOR ENGINEERING, INC, Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 62 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Ste Jr. 8-2-99 Monda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clayiqy sandy silt Clear Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 6 total <br /> Guinn continued to haul and spread material from the clean stockpile for vegetative cover material on the <br /> south slope of the Ashpit. Guinn completed the south slope up to the berm at the hinge point. Guinn <br /> continued to excavate the material from the leachate impoundment pond area. Allied directed Guinn to place <br /> the wooded material over the clay mixing pad. The water truck continues to moisture condition the haul <br /> roads and all work areas. Guinn brought 2 rolls of geotextile to be placed as the waste sheets under the <br /> plywood at the future tie in. <br /> Vector Engineering,Inc. CQA observed excavation of the leachate pond area and placement of vegetative <br /> cover material. <br /> [File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �l <br />