8/11/99 Construction Field Report Job No. 986011.0', <br /> DM No. 69 VECTOR ENGINEERING, C. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report SequenceNo.: <br /> Forward Landfill Allied Waste 69 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch StefaniJr. 8-11-99 _Wednesday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Robert Burns <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Clayey sandy silt Partly Cloudy FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roff r,Volvo A25B Rock Truck <br /> ff�NOTES(Describe work completed during the fty,any problems and their solutions): <br /> Guinn Crew: 8 total Dewalt Surveying Crew: 2 total <br /> A Volvo rock truck arrived on site today. Guinn continued to excavate and grade the leachate impoundment <br /> pond floor and slopes. Guinn utilized the 140G grader to finish grade the pond slopes. Guinn compacted the <br /> pond floor with the smooth drum roller. The water truck continues to moisture condition the material for fill <br /> and all of the haul roads. Guinn brought in 3 laborers to work on rounding all of the comers on the pond that <br /> will get lined and to patch voids on the slopes. Guinn utilized a ditch witch to excavate the trench for the <br /> Iysiometer tubing. Guinn augured the 4 holes for the lysiometers. Guinn started excavation of the anchor <br /> trench around the leachate pond. Guinn placed and covered the plywood underlined by geotextile on the top <br /> deck west end,the berm on the south top and northern slope of the Ashpit. Guinn started placement of 0 <br /> Earthfill on the northwest slope termination berm and the top deck of the Ashpit.Dewalt did topo shoots on <br /> the leachate impoundment pond and the operation layer material. Dewalt also shoot the liner termination <br /> points. <br /> Vector Engineering,Inc. Observed grading on the leachate impoundment slopes. Placement of earthfill on <br /> the Ashpit to construct the northwest termination berm. Observed surveying of the cell floor operations layer <br /> and topo of the leachate impoundment. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />