My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/12/99 Construction Field Report Job No. 986011.0', <br /> DFR No. 70 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 70 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch StefaniJr. 8-12-99 Thursday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Robert Burns <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Clayey sandy silt Partly Cloudy FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,CS 563C <br /> Cat Smooth Drum Roller,Volvo A25B Rock Truck. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 8 total <br /> The D5 left the site today. Guinn completed excavation of the leachate impoundment anchor trench except <br /> where access is necessary. Guinn continues to place the berm material on the western edge of the Ashpit. <br /> Guinn is placing the operations layer material on the top of the Ashpit. The water truck continues to <br /> moisture condition all over the site. Guinn graded and smooth drum rolled the cell floor for a more <br /> uniformed look. Guinn cleaned up wooded debris and geotextile roll cores from around the site. Guinn <br /> compacted earth fill around the sump tank in cell WMU D-99. Guinn excavated around the sump tank in cell <br /> WMU D-98. Guinn started construction of the western berm o cell WMU D-99. Kleinfelder installed the 4 <br /> lysometers under the sump in the leachate impoundment pond. <br /> Vector Engineering, Inc. Observed placement of the operations layer material on the Ashpit. CQA tested <br /> compaction on the subgrade in the leachate impoundment. CQA observed the excavation of the sump tank in <br /> cell V;W D-98. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.