Laserfiche WebLink
8/13/99 Construction Field Repoli Job No. 986011.0: <br /> DFR No. 71 VECTOR N IN ERIN , INC. Page No. z <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 71 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr. 8-13-99 Friday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Pard <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Robert Burns <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Clayey sandy silt Clear Warne FRANK DELL-ERA <br /> Equipment used: <br /> Quinn: 1400 Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,CS 563C <br /> Cat Smooth Drum Roller. <br /> MOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 8 total <br /> Guinn continues to place the operations layer material on the top of the Ashpit. The water truck continues to <br /> moisture condition all over the site. Guinn backfilled the lysometer trenches in the sump of the leachate <br /> impoundment pond. Guinn continues to construct the western berm and compact earthfill around the sump <br /> tank in cell WMU D-99. Guinn hand racked and rounded the trenches and slopes of the leachate <br /> impoundment pond. <br /> Vector Engineering,Inc. Observed placement of the operations layer material on the Ashpit.`l'ested <br /> compaction of the western berm of cell WMU D-99. <br /> -0 <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br /> I qS <br />