My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/16/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 72 VECTOR ENGINEERING, C. Page No. l <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 72 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stef Jr. 8-16-99 Mon( <br /> a <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purd <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Robert Burns Dave Tuttle <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Cla a sandy silt Clear Hot FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,CS 563C <br /> Cat Smooth Drum RoU r Volvo A25B Rock Truck.GSE:Gradall John Deere 544 Loader. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total GSE Crew: 12 total <br /> Guinn completed the placement of operations layer material on the top deck and southern berm of the <br /> Ashpit. The water truck continues to moisture condition all over the site. Guinn brought in and welded the <br /> 12"riser pipe for the sump in the leachate impoundment pond and Guinn welded the drop inlet for the <br /> leachate collection system. Guinn continues to construct the western berm with earthfill. Guinn started <br /> placing earthfill on the east slopes 2d bench above the cell floor. <br /> GSE arrived on site in a.m. GSE filled sandbags and started deployment of the GCL and the secondary liner <br /> system in the leachate 'impoundment pond. GSE deployed a total of 26 panels GCL totaling approximately <br /> 9,958ft2. GSE deployed a total of 16 panels of 60 mil smooth geomembrane totaling approximately 9,558 fl <br /> All Panels were welded and aiested. <br /> Vector Engineering,Inc. Observed placement of the operations layer material on the Ashpit. Observed and <br /> logged GCL and Liner placement. CQA took photos and informed Allied of the Water truck and 623 paddle <br /> wheel accident. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �S <br />
The URL can be used to link to this page
Your browser does not support the video tag.