My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/17/99 Construction Field Report Job No.986011.0', <br /> DFR No. 73 VECTOR. ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 73 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan/ Jr. 8-17-99 Tuesday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Robert Burns Dave Tuttle <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Clayey sandy silt Clear Hot FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,CS 563C <br /> Cat Smooth Drum Roller Volvo A25B Rock Truck.GSE:Gradall,John Deere 544 Loader. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 8 total GSE Crew: 12 total <br /> Guinn continues to construct the bench berm on the 2nd bench and the I'bench of cell WMU D-99 eastern <br /> slope. Guinn continued to construct the western berm along cell WMU D-99. Guinn utilized the grader to <br /> finish grade the top deck of the Ashpit. Guinn constructed the northwestern berm of the Ashpit. The water <br /> truck continues to moisture condition all over the site. <br /> GSE deployed GCL and secondary liner system in the leachate impoundment pond. GSE lined the sump area <br /> today. GSE deployed a total of 33 panels GCL totaling approximately 34,891fe. GSE deployed a total of 12 <br /> panels of 60 mil smooth geomembrane totaling approximately 34,839f 2. GSE performed repairs,vacuum <br /> tested and airtested all seams. <br /> Vector Engineering, Inc. Observed placement and logged GCL and Liner panels, overlap, seaming, and <br /> repairs. CQA observed construction of the access ramp and placement of bench berm material. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �S <br />
The URL can be used to link to this page
Your browser does not support the video tag.