Laserfiche WebLink
8/18/99 Construction Field Report Job No. 986011.0', <br /> DFR No. 74 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 74 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr. 8-18-99 Wednesda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Robert Burns Dave Tuttle <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clayey sandy silt Clear Cool FRANK DELL-ERA <br /> CHRIS KING <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,CS 563C <br /> Cat Smooth Drum Roller Volvo A25B Rock Truck. GSE: Gradall John Deere 544 Loader. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total GSE Crew: 12 total <br /> Guinn completed construction of the bench berms on the eastern slope of the sump in cell WMU D-99. <br /> Guinn placed the first lift of earthfill in the anchor trench around the Leachate impoundment pond in areas <br /> approved by CQA. Guinn utilized the excavator to compact the slope below the south roadway. Guinn <br /> started to push the material for the termination berm on the southern slope. The water truck continues to <br /> moisture condition all over the site. <br /> GSE deployed GCL and secondary liner system in the leachate impoundment pond. GSE lined the sump area <br /> today. GSE deployed a total of 25 panels GCL totaling approximately 10,221ft W. GSE deployed a total of 9 <br /> panels of 60 mil smooth geomembrane totaling approximately 13,24ft. GSE performed repairsvacuum <br /> tested and airtested all seams. <br /> Vector Engineering,Inc. Observed placement and logged GCL and Liner panels,overlap, seaming,and <br /> repairs. CQA observed construction of the bench berms. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �s <br />