My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/19/99 Construction Field Report Job No.986011.0', <br /> DFR No. 75- VECTOR ENGINEERING,, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 75 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan Jr. 8-19-99 Thursday <br /> General Contractor. Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guirm Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Robert Burns I Dave Tuttle <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clayey sandy sdt Clear Warm FRANK DELL ERA <br /> CHRIS KING <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,CS 563C <br /> Cat Smooth Drum Roller Volvo A25B Rock Truck. GSE: Gradall John Deere 544 Loader. <br /> NOTES(Describe wet*completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total GSE Crew: 12 total <br /> Guinn completed construction of the bench berms on the eastern slope of cell WMU D-99. Guinn continued <br /> to push and compact the material for the termination berm on the southern slope of cell WMU D-98. Guinn <br /> completed placement of the 12"riser pipe in the leachate impoundment sump wrapped by a burrito of 8oz <br /> geotextile and coarse gravel. The water truck continues to moisture condition all over the site. <br /> GSE performed repairs and vacuum testing so Guinn could place the geotextile, pipe, and coarse gravel <br /> material in the sump area. GSE cleaned up around the site. GSE stagged rolls of GCL for deployment as <br /> soon as Guinn completes the sump detail. GSE started deployment of GCL late afternoon. GSE placed 37 <br /> panels of GCL totaling approximately 12,944ft <br /> Vector Engineering,Inc. Observed repairs and vacuum testing of sump area. CQA observed placement of the <br /> geotextile,pipe and coarse aggregate into the sump. During placement of the coarse gravel Guinn ran the <br /> excavator onto the eastern edge of the liner system. CQA had Guinn excavate the coarse gravel from on top <br /> of the geotextile and pull the geotextile back to expose the underlying geomembrane. CQA inspected to find <br /> several pinch points from the tracks. CQA informed GSE of the repairs to be made. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �l <br />
The URL can be used to link to this page
Your browser does not support the video tag.