Laserfiche WebLink
5-17-99 Weekly Field Report Job No. 986011.0: <br /> WFR No.21 VECTOR ENGINEERING, INC. Page No. 1/-2- <br /> Project <br /> /.2_Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Land Fill Allied Waste 2 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr 5-17 TO 5-23-99 Mon—sin <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Grading Contractor Superintendent Or Foreman: <br /> Duane Meaddows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Clear FRANK DELL-ERA <br /> Equipment used: <br /> Guim:14OG Grader,2-633 Paddle Wheels,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck.Allied: 2-300E <br /> Cat Rock Trucks 325 Cat Excavator,D8,D4, 140G Grader Smooth Drum Roller.14OG Grader 2-633 Paddle wheels <br /> NOTES(Describe work completed daring the day,any problems and their solutions): <br /> Monday May 17, 1999 <br /> Guinn—Guinn utilized an excavator and 2 laborers to complete exposing the liner tie in. Guinn started cutting the cell <br /> floor subgrade material next to the liner tie in area. Guinn has the D6R and grader ripping the cell floor. Guinn is <br /> utilizing 1-623 and 2-633 paddle wheels to haul the material to a stockpile to the northwest of the cell. <br /> Allied—Allied is placing and compacting subgrade material on the eastern slope of the Ashpit. Allied is utilizing the <br /> D8 to spread and track walk the material and the smooth drum roller to compact. CQA tested the subgrade material <br /> with all tests meeting the required specifications. <br /> Tuesday May 18, 1999 <br /> Guinn—Guinn continues to excavate the material from the floor of Cell WMU D-99. Guinn continues to place material <br /> suitable for the clay mix in the stockpile. Guinn " " 1-623/2633 paddle wheel scrapers to excavate the material <br /> from the cell and stockpile. Guinn has the D6R and the grader ripping the subgrade material.The water truck continues <br /> to perform dust control and is moisturizing the stockpile as material is being placed. <br /> Allied—Allied continues to work on subgrade preparation on the eastern slope. Allied is utilizing an excavator to load <br /> 2 rock trucks to haul material from WMU B to the eastern slope above the third bench. The material is being placed and <br /> track walked by a D4 and aD8 in approximately 8"loose lifts. <br /> Wednesday May 19, 1999 <br /> Guinn—Guinn started the Ione clay import haul today,With approximately 1,800 tons being delivered today. Guinn <br /> continues to excavate the material from Cell WMU D-99. Guinn is sorting the material suitable for the clay mix in one <br /> stockpile and the material from the road area in a separate stockpile. Guinn worked on the southern slope of the cell. <br /> Guinn utilized. 1-623/2633 paddle wheel scrapers to excavate the material from the cell and stockpile. Guinn has the <br /> D6R ripping the subgrade material. Guinn has the grader cutting the 2:1 slope.The water truck continues to perform <br /> dust control and is moisturizing the stockpile as material is being placed. <br /> Allied—Allied continues to work on subgrade preparation on the eastern slope.Allied is utilizing an excavator to load <br /> 2 rock trucks to haul material from WW B to the eastern slope.The material is being placed and track walked by a D4 <br /> and aD8 in approximately 8"loose lifts. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />