My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5-17-99 Weeldy Field Report Job No. 986011.0: <br /> WR No.21 VECTOR ENGINEERING, INC. Page No. <br /> Thursday May 20, 1999 <br /> Guinn—Guinn completed the lone clay import haul today, With approximately 1,800 tons being delivered today. <br /> Guinn continues to excavate the material from Cell WMU D-99. Guinn continues to sort the material suitable for the <br /> clay mix in one stockpile and the questionable material in a separate stockpile. Guinn worked on the southern slope of <br /> the cell. Guinn utilized 1-623/2633 paddle wheel scrapers to excavate the material from the cell and stockpile. <br /> Guinn has the D6R ripping the subgrade material. Guinn has the grader cutting the 2:1 slope. The water truck continues <br /> to perform dust control and is moisturizing the stockpile as material is being placed. <br /> Allied—Allied continues to work on subgrade preparation on the eastern slope. Allied is utilizing an excavator to load <br /> 2 rock trucks to haul material from WMU B to the eastern slope above the third bench.The material is being placed and <br /> track walked by a D4 and aD8 in approximately 8"loose lifts. <br /> Friday May 21, 1999 <br /> Guinn—Guinn continues to excavate the material from Cell WMU D-99. Guinn continues to sort the material suitable <br /> for the clay mix in one stockpile and the questionable material in a separate stockpile. Guinn worked on the eastern <br /> slope from the first bench down and on the southern slope of the cell. Guinn utilized 1-623/2633 paddle wheel scrapers <br /> to excavate the material from the cell and stockpile. Guinn has the D6R ripping the subgrade material. Guinn has the <br /> grader cutting the 2:1 slope.The water truck continues to perform dust control and is moisturizing the stockpile as <br /> material is being placed. <br /> Allied—Allied continues to work on subgrade preparation on the eastern slope. Allied is utilizing an excavator to load <br /> 2 rock trucks material from WMU B. The material is placed in approximately 8"loose lifts.The material is being <br /> spread and track walked by a D4 and a D8 Cat. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.