My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5-24-99 Weeldy Field Report Job No. 986011.0: <br /> WFR No.3 VECTOR ENGINEERING, INC. Page No. l/2, <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Land Fill Allied Waste 3 <br /> Locates Of Work: Owner's Or Client's Representative: Date: Day Of Weds: <br /> Manteca,CA Butch Stefi4 7r 5-24-99 TO 5-30-99 Neon-sun <br /> General Contractor. liner Contractor: Pmj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> Geral Forman Grading Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Somme And Description Of Fill Material: Weather: CQA Technician: <br /> Clear Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader, 1-623/3-633 Paddle Wheels,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck. Allied:2- <br /> 300E Cat Rock Trucks 325 Cat Excavator D8,D4, 140G Grader Smooth Drum Roller. <br /> NOTES(I)escribe work completed during the day,any problems and their solutions): <br /> Monday May 24, 1999 <br /> Guinn—Guinn has the D6R and grader ripping the eastern slope and the southern slope from the 1"bench above the cell <br /> floor. Guinn is utilizing 1-623 and 2-633 paddle wheels to haul the clayey material to the clay mix stockpile. Guinn <br /> excavated the old LCRS pipe in the southeast corner of the cell with the excavator. Guinn placed some clayey material <br /> in the excavated hole. While excavating the southern slope Guinn over excavated Y. Guinn placed some clayey <br /> material for backfill and compacted to 90%. <br /> Allied—Allied is placing subgrade material on the southern slope of the Ashpit. Allied is hauling the material from <br /> WMU B to the Ashpit utilizing 2 rock trucks.Allied is utilizing the D4 and D8 to spread and track walk the material. <br /> Tuesday May 25, 1 999 <br /> Guinn—Guinn continues to utilize 2-633/1623 scrapers to excavate the material from the south end of <br /> Cell WMU D- <br /> 99. Guinn continues to place and moisture condition the stockpile. Guinn the D6R and the grader ripping the <br /> subgrade material.The water truck continues to perform dust control. Gumn utilized the excavator to expose the <br /> leachate line to the west of the cell. <br /> Allied—Allied is placing garbage and cover material from Cell WMU B as fill on the southeastern slope. Allied is <br /> utilizing an excavator to load 2 rock trucks to haul material from WMU B to the top and western slope of the Ashpit. <br /> Allied utilized the D8 and the smooth drum to compact the subgrade material. <br /> Wednesday May 26, 1999 <br /> Guinn—Guinn continues to utilized 1-623/2-633 paddle wheel scrapers to excavate the material from the south side of <br /> the cell and haul it to the stockpile. Guinn has the D6R ripping the subgrade material. Guinn has the grader cutting the <br /> 2:1 slope.The water truck continues to perform dust control and is moisturizing the stockpile as material is being <br /> placed. Guinn excavated the clay tie in along the sump area of Cell WMU D-98. <br /> Allied—Allied continues to work on subgrade preparation on the west slope of the Ashpit. Allied is utilizing an <br /> excavator to load 2 rock trucks to haul material from WMU B to the west slope.The material is being spread and track <br /> walked by a D4 and a D8 in approximately 8"loose lifts. Allied continues to place garbage and daily cover material as <br /> fill on the southeastern slope. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.