5-31-99 Weekly Field Report Job No. 986011.0', <br /> WM No.4 VECTOR ENGINEERING, INC. Page No. 112- <br /> Project <br /> /z.Project Nana: Client Or Owner: gaily Field Report Sequence No.: <br /> Forward Land Fill Allied Waste 4 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Marn CA Butch Stefani,Jr 5-31—"TO 6--6-" Mon-son <br /> General Contractcr: Liner Contractor: Prof. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Grading Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Narco Clay on site sandy clay Cloudy,Rainy, FRANK DELL-ERA <br /> Warm <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,136R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,815F Cat <br /> Sheepfoot Compactor.Griffin:2 Water trucks,WR2500,RS650 mixers. Allied:2 Rock Trucks,D8,D4, 140G Grader, Smooth <br /> Drum Roller. <br /> NOTES(Describe work completed during the day,any problems and their solations): <br /> Monday May 31, 1999 <br /> Allied—Allied is placing garbage as subgrade fill on the southeast edge of cell WMU D-99. <br /> Tuesday June 1, 1999 <br /> Guinn—Griffin soils stabilization started the clay mix today. Griffin utilized 2 mixers and 2 water trucks.Griffin made <br /> 1 pass with a water truck hooked up to the mixer for moisture conditioning as the material is being processed. A 2°d <br /> pass by the 2nd mixer with out water for remix. Guinn utilized 2-633/1-623 paddle wheel scrapers to haul the clay and <br /> on site material suitable for the clay mix to the mixing pad.The soils were placed in approximately.75' on site soils to <br /> .25' for the Na=import clay. Guinn the grader level the top of each lift prior to placement of the subsequent lift. <br /> Guinn ues to excavate the material from the floor of Cell and the access ramp WMU D-99. Guinn has the D6R <br /> pushing scrapers through the clay and cutting the slopes of the access ramp in the southwest comer of cell WMU D-99. <br /> The water truck continues to perform dust control. <br /> Allied—Allied continues to work on the anchor trench area and subgrade preparation on the backside of the <br /> southeastern slope. Allied is utilizing garbage for fill in the heavy fill areas with daily cover from WMU B. <br /> Wednesday June 2, 1999 <br /> Guinn—Griffin soils stabilization completed the Narco clay mix today.Guinn utilized 2-633/1-623 paddle wheel <br /> scrapers to haul on site material suitable for the clay mix to the mixing pad. Guinn utilized the paddle wheels to haul the <br /> clay to the mixing pad.Between each lift Guinn had the grader level the top prior to placement of the subsequent lift. <br /> Guinn utilized the paddle wheel scrapers to excavate the material from the cell floor and the access ramp to the <br /> stockpiles.Guinn has the D6R ripping the subgrade material. Guinn has the grader cutting the 2:1 slope.The water <br /> truck continues to perform dust control and is moisturizing the stockpile as material is being placed. <br /> Allied—Allied continues to haul garbage for subgrade placement on the southeastern slope just east of the liner <br /> termination point. Allied is utilizing 2 rock trucks to haul material from WMU B for daily cover. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed.by: <br />