My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6-7-99 Weepy Field Report Job No. 986011.0 <br /> WFR No.5 VECTOR ENGINEERING, WC. Page No. 1122 <br /> Project Name: Client Or Owner: Daily Field Report sequence No.: <br /> Forward Land Fill Allied Waste 5 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefani,Jr 6-7-99 TO 6-13-99 Mon-sun <br /> General Contractor. Liner Contractor: Proj. Fanginneer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Grading Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Sow=And Description Of Fill Material: WeatherCQA Technician <br /> Narco Clay on site sandy clay Clear Cool FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D5H Cat Dozer,D6R Cat Dozer,320L Cat Excavator,966D Cat loader, <br /> Water Truck,815F Cat Sheepfoot Compactor. Allied: 2 Rock Trucks,D8,D4, 14OG Grader, Smooth Drum Roller and Water <br /> Truck <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Monday June 7, 1999 <br /> Guinn—Guinn construction is continuing to excavate the cell floor and the access ramp utilizing 1-633/1-623 paddle <br /> wheel scrapers. Guinn has the laser set up to help control finish grade on the cell floor. The water truck continues to <br /> perform dust control and maintain moisture on the clay stockpile. <br /> Allied—Allied continues to place garbage as fill material on the southeast edge of cell WMU D-88. Allied utilized the <br /> smooth drum roller to compact the final lift on the top of the Ashpit. <br /> Tuesday June 8, 1 <br /> Guinn—Guinn construction is continuing to excavate the cell floor and the access ramp utilizing 1-633/1-623 paddle <br /> wheel scrapers. Guinn has the laser set up to help control finish grade on the cell floor. The water truck continues to <br /> perform dust control and maintain moisture on the clay stockpile. Guinn utilized the excavator to excavate the sump and <br /> portions on the LCRS channel.Guinn utilized the excavator and the 623 scraper to remove the old road base material <br /> from the first bench above the cell floor. <br /> Allied—Allied continues to place garbage as fill material on the southeast edge of cell WMU D-88 <br /> Wednesday June 9, 1999 <br /> Guinn—Guinn construction is continuing to excavate the cell floor and the access ramp utilizing 1-633/1-623 paddle <br /> wheel scrapers. Guinn has the laser set up to help control finish grade on the cell floor. The water truck continues to <br /> perform dust control and maintain moisture on the clay stockpile. Guinn cut the LCRS collection pipes from cell WMU <br /> D-98 and capped them off. Guinn cut the subgrade LCRS channel areas with the 623 scraper. Dewalt completed the <br /> subgrade Topo today on the southern road. Dewalt shoot top of subgrade material for clay placement approval. <br /> Allied—Allied continues to place garbage as fill material on the southeast edge of cell WMU D-88. Allied placed <br /> subgrade fill on the southern end of the eastern slope. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: ir5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.