Laserfiche WebLink
6-7-99 weekly Field Report Job No. 986011.0: <br /> WFRNo.5 VECTOR ENGINEERING, INC. Page No. <br /> Thursday June 10 1999 <br /> Guinn—Guinn construction is continuing to excavate the cell floor and the access ramp utilizing 1-633/1-623 paddle <br /> wheel scrapers. Guinn has the laser set up to help control finish grade on the cell floor. The water truck continues to <br /> perform dust control and maintain moisture on the clay stockpile. Guinn continued to cut the subgrade in the LCRS <br /> channelsd. Dewalt completed the subgrade Topo today on the cell floor for verification of grade. <br /> Allied -Allied continues to place garbage as fill material on the southeast edge of cell WMU D-88 <br /> Friday June 11, 1999 <br /> Guinn—Dewalt is on site setting offset staking for the sump area, Dewalt is also resurveying the Topo for quantities of <br /> the excavation. <br /> Allied—Allied continues to place garbage as fill material on the southeast edge of cell WMU D-88. Allied is smooth <br /> drun rolling the subgade all over the site for GCL placement. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />