Laserfiche WebLink
6-14-99 Weeldy Field Report Job No. 986011.0: <br /> WFR No.6 VECTOR ENGINEERING,'INC. Page No. 1'z <br /> Project Nacre: Client Or Owner: Daily Field$epert Sequence Na: <br /> Forward Land Fill Allied Waste 6 <br /> Location Of Work: Owner's Or Client's Repsesartative: Date: Day Of Weds: <br /> Manteca,CA Butch Stefan,Jr 6-14-99 TO 6-20-99 Mon–San <br /> General Contractor. Liner Contractor. Proj.Fngin— Reviewed By <br /> Guinn Construction GSE Scott Egrk <br /> General Forman Grading Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather. CQA Technician: <br /> Narco Clay on site sandy clay Clear Cool FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G{3rader,3-633/1623 Paddle Wheels,D5H Cat Dozer,320L1Cat Excavator,966D Cat loader,Water Truck,815F <br /> Cat Sh oot Com ctor,Cat Smooth Drum Roller. Allied: Smooth Drum Roller,Water Truck- <br /> NOTES <br /> ruckNOTES(Describe work completed during the day,any problems and their solutions): <br /> Monday June 14, 1999 <br /> Guinn-Guinn started placement of the clay liner system on the north end of the cell floor. Guinn scarified and moisture <br /> conditioned the subgrade prior to placement of the clay material. Guuw�xipped the-stockpile with the D5H Cat Dozer. <br /> Guinn utilized 3-633 paddle wheel scrapers to haul the clay material to the cell floor. Guinn compacted the material with <br /> the 815F Sheepfoot compactor in approximately 6-8"loose lifts. Guinn utilized the scrapers to help with compaction by <br /> wheel rolling the clay material after the 815 compacted and the grader scraped the loose material from the surface. Prior <br /> to the subsequent lift Guinn utilized the Sheepfoot compactor to rescarify the lift prior to placement of the next lift, <br /> Guinn utilized the scrapers to wheel roll and seal the moisture in the clay stockpile. <br /> Allied—Allied is smooth drum rolling the top of the subgrade material for GCL placement. Allied completed placement <br /> of the earthfdl material on the south slope of cell WMU D-88. Allied utilmd the water truck to maintain moisture in the <br /> subgrade. <br /> Tuesday June 15, 1999 <br /> Guinn-Guinn continued placement of the clay liner system. Guinn completed placement of the north end of the cell <br /> floor and started on the south end. Guinn utilized 2-633/1-623 paddle wheel scrapers to hautthe clay material to the cell. <br /> Guinn compacted the material in 6-8"loose lifts with the 815F Sheepfoot compactor. Guinn scarified and moisture <br /> conditioned the clay material prior to the placement of the next lift. Guinn continued to rip the stockpile with the D5H <br /> Cat Dozer. Guinn utilized the scrapers to wheel roll the surface of the clay. Prior to the subsequent lift Guinn utilized the <br /> Sheepfoot compactor to scarify the lift. CQAperformed density tests that failed: CQA pulled moisture samples to <br /> confirm failing moistures. Guinn shut down the scrapers and ripped up the failing clay with the D5H Cat Dozer and <br /> allowed it to aerate until the proper moisture was obtained. Guinn then reworked the area to meet specifications. Guinn <br /> wheel rolled the floor to seal the clay liner system. <br /> Allied—Allied utilized the wafter truck to maintain moisture in the subgrade material. Allied completed smooth drum <br /> rolling of the subgrade material. <br /> Wednesday June 16, 1999 <br /> Guinn—Guinn completed placement of the clay onto the cell floor. Guinn still needs to grade and compact the top lift on <br /> the north and south ends of the cell floor utilizing the laser to achieve the 2%flow towards the LCRS channel. Prior to <br /> placement of clay Guinn utilized the grader to scarify and the water truck to moisture condition the clay material.Guinn <br /> utilized 2-633/1-623 paddle wheel scrapers to hauf the clay material from the stockpile to the cell. Guinn compacted the <br /> material in 6-8"loose lifts with the 815F Sheepfoot compactor. Guinn ran out of clay material today and will grade the <br /> north side of the cell floor and move excess material to the south side. Guinn should have enough clay material to <br /> [File Name: Forward Landfill Prepared by. Frank Dell-Era Reviewed by: <br />