6-14-99 Weekly Field Report Job No. 986011A: <br /> WFR No.6 VECTOR ENGINEERING, C. Page No. <br /> complete the cell floor but not the s area. In the afternoon-Guinn built a temporary mp sump � rary access ramp to the south of <br /> Ashpit for construction of the southern road. <br /> Allied-Allied utilized the water truck to maintain moisture in the subgrade material. <br /> Thursday June 17, 1999 <br /> Guinn-{Guinn continues to work on the final lift on the north and south ends of the cell floor utilizing the laser to achieve <br /> the 2%flow towards to LCRS charnel today. Guinn started to excavate the north to south LCRS channel today. Guinn <br /> continued to construct the roadway to the south of Ashpit. Guinn utilized 2-633 paddle wheel scrapers to haul subgrade <br /> material from the clayey earthfill stockpile to the south roadway. Guinn compacted the material in 6-8 loose lifts with <br /> the 815F Sheepfoot compactor. Prior to placement of the subgrade material Guinn scarified and moisture conditioned the <br /> existing subgrade. Guinn had a laborer hand raking the loose material from the eastern slope below bench#1. The <br /> laborer hand raked and shoveled loose material from under the liner edge tie in to cell WMD D-98. <br /> Allied- Allied utilized the water truck to maintain moisture in the subgrade material. <br /> Friday June 18, 1999 <br /> Guinn-Guinn continues to work on the lift on the north and south ends of the cell floor utilizing the laser to achieve the <br /> 2%flow towards-the LCRS channel and the I%flow to-the sump area. Guinn excavated the LCRS channel on the <br /> eastern side of the cell floor running north to south. Guinn replaced all of the excavated material from the sump area. <br /> Guinn will excavate the sump area to precipitate the GCL placement instead of clay. Guinn utilized 633 paddle wheel <br /> scraper to haul subgrade material to the sump area cell. Guinn excavated the anchor trenches on the Eastern slopes sou* <br /> end and the Ashhpits Northwest slope and started the trench down the Southwest slope of the Ashpit. <br /> Allied-Allied utilized the water truck to maintain moisture in the subgrade material. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: VS <br />