My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6-21-99 Weeldy Field Report Job No. 986011.0: <br /> WFR No.7 VECTOR ENGINEERING, INC. Page No. 1/z <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Land Fill Allied Waste 7 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch St Jr 6-21-99 TO 6-27-99 Mon—Sun <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Grading Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Sauce And Description Of Fill Material: Weather. CQA Technician: <br /> Narco Clay on site sandy clay Clear Hot FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck, 815F Cat <br /> She e foot Com actor. Allied:2 Rock Trucks,D8,D4, 140G Grader, Smooth Drum Roster,Water Truck. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Monday June 21, 1999 <br /> Guinn—Guinn construction is continuing to excavate the LCRS channels on the cell floor.Guinn continues to utilize <br /> the laser to grade the clay on the cell floor. Guinn continues to construct the southern roadway.The water truck <br /> continues to perform dust control and maintain moisture on the clay stockpile. <br /> Allied—Allied built the lay down pad for the liner being delivered today. Allied unloaded 4 track loads of material <br /> with 24 rolls of 8oz/geonet/8oz geocomposite,totaling 67,200 IV, 30 rolls of HST 60 mil liner totaling 351,000ft and <br /> 9 rolls of HDT 60 mil liner totaling 85,050ft <br /> Tuesday June 22, 1999 <br /> Guinn-Guinn continues to work on the final lift on the south end of the cell floor utilizing the laser to <br /> achieve the 2%flow towards the LCRS channel and the 1%towards the sump area. Guinn continues to <br /> excavate the LCRS channels running north to south. Guinn excavated the sump area to precipitate GCL <br /> placement instead of 2' of clay. Guinn had a laborer hand raking the slopes below the first bench on the east <br /> and south of the cell floor. Guinns grader broke down at 12:00p.m. Guinn will complete the clay tomorrow <br /> a.m. Guinn has the water truck maintaining moisture in clay and dust control around the site. <br /> Allied unloaded 1 load of 861 geotextile from GSE. <br /> Wednesday June 23, 1999 <br /> Guinn-Guinn continues to work on the cell floor utilizing grader and excavator to cut the LCRS channels. <br /> Guinn continues to have a laborer hand rake the slopes below the first bench on the east and south of the cell <br /> floor. Guinn wheel rolled the toe of the eastern slopes subgrade with the loader. Guinn has the water truck <br /> maintaining moisture in the clay and performing dust control all over the site. Guinn worked on the south <br /> roadway along the Ashpit for GCL panel placement. Dewalt was on site performing survey verification of <br /> clay thickness on the cell floor and LCRS collection V ditches. Dewalt sent the results of the survey to <br /> Vector Engineering for review by the Construction manager. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.