My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6-21-99 Weekly Field Report Job No. 986011.0: <br /> wFR No.7 VECTOR ENGINEERING, INC. Page No. 2 <br /> Thursday June 24, 1999 <br /> Guinn—Guinn continues to work on the slopes below the first bench on the east and south of the cell floor. <br /> Guinn completed the clay liner system except for the final smooth drum rolling. Guinn utilized the excavator <br /> and the smooth drum roller to dress up the slope to cell floor transition grade. Guinn has the water truck <br /> maintaining moisture in the clay and performing dust control all over the site. Dewalt completed performing <br /> the survey verification of clay thickness and the asbuilt of the south roadway. Dewalt sent copies of the <br /> survey to Vector Engineering,Inc. for review. <br /> Allied unloaded GCL,Liner, Geocomposite,Geonet and stockpiled it at the lay down area. <br /> Friday June 25, 1999 <br /> Guinn—Guinn continues to work on the slopes below the first bench on the east and south of the cell floor. <br /> Guinn utilized the smooth drum roller to dress up the slope to cell floor transition grade on the south slope. <br /> Guinn pulled all of the hubs and the staking off of the slopes where liner is to be placed. Guinn smooth drum <br /> rolled portions of the cell floor and hand shoveled loose material out of the LCRS channels. Guinn has the <br /> water truck maintaining moisture in the clay and performing dust control all over the site. Guinn continued <br /> to grade and smooth drum roll portions of the site for GCL placement. <br /> Allied unloaded 1 load of GCL Liner and 1 load of geocomposite material. 0 <br /> Material delivered to site this week. <br /> Material Delivered Total Delivered Total fe Delivered to Date <br /> HDT 60 mil 105,300 105,300 <br /> HME 60 mil 169,200 169,200 <br /> HST 60 mil 378000 378000 <br /> Geonet 71,400 71,400 <br /> Geotextile 81,000 81,000 <br /> Geocom osite Single sided 210,000 210,000 <br /> Geocom osite Double sided 119,000 119,000 <br /> GCL 126,000 126,000 <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.