Laserfiche WebLink
6-28-99 Weekly Field Report Job No. 986011.0: <br /> vim No.9 VECTOR ENGINEERING, INC. Page No.3/3 <br /> Material Delivered Total if Delivered Total ff Delivered to Date <br /> HDT 60 mil 105,300 <br /> HUE 60 mil 169,200 <br /> HST 60 mil 378,000 <br /> Geonet 71,400 <br /> Geotextile 81,000 <br /> Geocom osite Single sided 210,000 <br /> Geocomposite Double sided 119,000 <br /> GCL 191,100 317,100 <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �►7 <br />