My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7-5-99 Weekly Field Report Job No. 986011.0: <br /> WFR No.9 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Client Or Owner. 9 <br /> Forward Land Fill Allied Waste <br /> Location Of work: Owner's Or Client's Representative: Date: Day Of week: <br /> Manteca,CA Butch Stefan Jr 7-5-99 TO 7-11-99 Mon–Sun <br /> General Contractor: Liner Contractor: P-j. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Grading Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician frecbnician: <br /> Clear Hot FRANK DELL-ERA <br /> ANTONIO HENRI UEZ <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,DSH Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Tacl CS 563C Cat Smooth Drum Roller. Allied:Forklift.GSE: 544E John Deere Loader Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Tuesday July 6, 1999 <br /> Guinn: Guinn worked on welding the pipe for the LCRS system. Guinn welded the T and 214ft of pipe in the <br /> north and south V channel on the eastern end of the cell floor. Guinn has the water truck all over the site, <br /> performing dust control. Guinn placed coarse gravel in a burrito wrap around the welded LCRS collection <br /> pipe in the western V channel on the southern end. <br /> GSE: GSE made repairs to the panels placed on the slope below the 2nd bench. GSE deployed geocomposite <br /> off of the 2nd bench down to the LCRS V on the cell floor eastern edge channel per plans. A total of 24 <br /> panels were deployed with approximately 39,795ft. All panels were tied but not sewn yet due to GSE does <br /> not have a sewing machine on site. GSE placed GCL and Geomembrane from the 3rd bench down to the 2nd <br /> bench. GSE deployed a total of 22 panels of GCL with approximately 24,352ft2. GSE deployed a total of 11 <br /> panels of geomembrane with approximately 23,798ft <br /> 2. <br /> Wednesday July 7, 1999 <br /> Guinn: Guinn placed and wrapped geotextile around plywood on the southwestern edge of the <br /> geomembrane. Guinn welded the pipe cross section onto the western end of the LCRS collection pipe. Guinn <br /> constructed a ramp to deploy GDM onto the cell floor. Guinn has the water truck performing dust control. <br /> GSE: GSE made repairs to the panels placed on the slope below the 3rd bench on the eastern slope of cell <br /> WMU D-99. GSE deployed GCL and geomembrane from the top deck down to the P bench. GSE deployed <br /> a total of 36 panels of GCL with approximately 28,352ft2. GSE deployed a total of 15 panels of <br /> geomembrane with approximately 19987ft2. <br /> Thursday July 8, 1999 <br /> Guinn: Guinn made repairs to the subgrade material on the eastern slope for GSE. Guinn started to import <br /> and place the GDM. Guinn is utilized the D411 Cat to spread the material and a laborer full time to watch for <br /> wrinkles in the geomembrane. Guinn had laborers cleaning loose material off of the geomembrane. Guinn <br /> placed part of the burrito in the LCRS V channel to the north of the sump. Guinn constructed a test pad <br /> utilizing the D5M. CQA inspected for damage and approval was given to utilize the 135M on F of material <br /> on the cell floor. At 3:30p.m.the ambient temperature on the geomembrane exceeded the 104 specifications <br /> and Guinn halted deployment of the GDM. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: iL <br />
The URL can be used to link to this page
Your browser does not support the video tag.