?-5-99 @@ y Field Report job No. 986011.0: <br /> WFR No.9 VECTOR ENGINEERING, INC. Page No.2 2- <br /> Thursday <br /> Thursday July 8, 1999 <br /> GSE: GSE made repairs to the panels placed on the slope below the top deck on the eastern slope of cell <br /> WMU D-99. GSE deployed geocomposite from the top deck down to the 2nd bench. GSE received sewing <br /> machines today and started seaming the GDN from the top deck down to the cell floor. GSE deployed 20 <br /> panels of geocomposite with approximately 46,980ft. GSE deployed GCL and geomembrane from the 3'd <br /> bench down the slope between the Ashpit and eastern slope. GSE deployed a total of 19 panels of GCL with <br /> approximately 15732ft2. GSE deployed a total of 12 panels of geomembrane with approximately 16,007ft2 <br /> . <br /> The ambient temperature,on the geomembrane was over 100 at 3p.m. (Per Specifications)GSE halted <br /> deployment. <br /> Friday July 9, 1999 <br /> Guinn continued the import and place the GDM pea Gravel. Guinn is utilizing the D4H and the 135M Cat <br /> Dozers to spread the GDM onto the geomembrane F minimum thickness: Guinn has a laborer watching for <br /> wrinkles in the geomembrane, Guinn cleaned loose material off of the geotextile tie in to last years cell: <br /> Guinn placed geotextile then operations layer material over the GDM once the minimum thickness was <br /> verified by CQA. Guinn ut li7..ed the scraper to haul the operations material to the western edge the cell floor. <br /> Guinn then utilized the D5M to spread the protective layer material onto the geotextile_ <br /> GSE deployed GCL and geomembrane on the southern slope of the Ashpit. GSE deployed a total of 12 <br /> panels of GCL with approximately 16,706.5ft2. GSE deployed a Natal of 8 panels of geomembrane with <br /> approximately 17,633ft2. GSE had 2 technicians sewing the geocomposite on the eastern slope until the <br /> machines broke down. GSE shut down.operations-Micn the temperature rose above the specified limits. <br /> Saturday July 10, 1999 <br /> GSE deployed GCL and HDT geomembrane on the southern slope of the Ashpit. GSE deployed a total of 20 <br /> panels of GCL with approximately 21,992f12. USE deployed a total of 11 panels of geomembrane with <br /> approximately 24,376ft. GSE deployed geocomposite on the eastern slope below the 2d bench on the <br /> southern end GSE deployed a total of 11 panels totaling approximately 20,895 Be. <br /> File Name: Forward Landfill Prepared by: Frank bell-Era Reviewed by: <br />