My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7-12-99 Weekly Field Report Job No. 986011.0,' <br /> V;M No.10 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Client Or Owner: 10 <br /> Forward Land Fill Allied Waste <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Ste Jr 7-12-99 To 7-18-99 Man–sun <br /> General Contractor: Liner Contractor: P-j. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott F*dy <br /> General Forman Grading Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician fredmician: <br /> Clear Hot FRANK DELL-ERA <br /> ANTONIO!MW <br /> QUEZ <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,DSH Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Trul CS 563C Cat Smooth Drum Roller. Allied:Forklift.GSE: 544E John Deere Loader Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Monday July 12, 1999 <br /> Guinn: Guinn continued the import and place the GDM onto the geomembrane 1' in minimum thickness. <br /> Guinn has a laborer watching for wrinkles in the geomembrane. Guinn imported some questionable GDM <br /> material. Guinn was informed that the material looked questionable. Guinn stockpiled the material to the <br /> north of cell until a sieve is completed by CQA. <br /> GSE: GSE deployed GCL and geomembrane on the top of the Ashpit. GSE deployed a total of 36 panels of <br /> GCL with approximate) 15,788.5fi. GSE deployed a total of 5 panels of HDT geomembrane with <br /> approximately 17,2591 GSE had 3 technicians wedge welding the geocomposite on the eastern slope. GSE <br /> shut down operations when the temperature rose above the specified limits for panel deployment. GSE <br /> deployed geocomposite until the heat was unbearable. GSE placed 6 panels of composite with approximately <br /> 6,870fl on the eastern slope. <br /> Tuesday July 13,1999 <br /> Guinn: Guinn continued to grade the GDM and the operations layer on the cell floor. Guinn utilized the D4H <br /> and the DSM to spread and grade the GDM and the operations layer material. Guinn placed geotextile over <br /> the approved GDM on the north side of the sump at the western edge of the cell floor. Guinn utilized the 623 <br /> paddle wheel to haul the operations layer material from the stockpile down to the cell floor. Guinn spread <br /> operations material 1' minimum thickness. <br /> GSE: GSE continues to deployed GCL and geomembrane on the top of the Ashpit. GSE deployed a total of 6 <br /> panels of GCL with approximately 7,695ftz. GSE deployed a total of 1 panel of geomembrane with <br /> approximately 4,312ft . GSE deployed double sided geocomposite on the top and the south slope of the <br /> Ashpit. A total of 22 panels of GCL were deployed with approximately 46,450if. GSE deployed single sided <br /> geocomposite on the eastern slope. A total of 10 panels with approximately 6375ft2 were placed. GSE <br /> welded the geocomposite seams on the eastern slope. <br /> Wednesday July 14, 1999 <br /> Guinn: Guinn continued to import and grade GDM the cell floor. Guinn continued to place operations <br /> material. Guinn is utilized a 623 paddle wheel to haul the operations material. The operations material is <br /> being placed at a 1' minimum thickness to 2' thick where the trucks and 623 run. Guinn has a water truck on <br /> site moisture conditioning the operations material at the stockpile area. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.