Laserfiche WebLink
7-26-99 Weekly Field Repoli Job No. 986011.0: <br /> WFR No.12 VECTOR ENGINEERING, INC. Page No. 2I2, <br /> Friday July 30, 1999 <br /> Guinn: Guinn continues to spread the vegetative cover material on the south slope of the Ashpit. Guinn <br /> continued to place bench material on the I"bench to the south of cell VVW D-99 and started to place bench <br /> material on the Yd bench on the eastern slope. Guinn continues to utilize the material from the earthfill <br /> stockpile as vegetative and bench material. Guinn is excavating the leachate impoundment pond area and <br /> stockpiling the wooded material in Allieds stockpile. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: US <br />