Laserfiche WebLink
8-2-99 Weeldy Field Report Job No.986011.0: <br /> wFR No.13 VECTOR ENGINEERING, INS. Page NQ. <br /> Project Name: Client Or Owner. 13 <br /> Forward Land Fill Allied Waste <br /> Location Of work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch StefkniIr 8.02-99 TO 8=8-99 Mon—Sim <br /> Gcncral Contractor: Lincr Contractor: Proj. Engin=: Rcvicwcd By: <br /> Guinn Construction GSE Scott Nurd <br /> General Forman Grading Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician/'Technician: <br /> Sandy clayey silt Clear Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D511 Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Monday August 2, 1999 <br /> Guinn: Guinn continued to haul and spread material from the clean stockpile for vegetative cover material on <br /> the south slope of the Ashpit. Guinn completed the south slope up to the berm at the hinge point. Guinn <br /> continued to excavate the material from the leachate impoundment pond area. Allied directed Guinn to place <br /> the wooded material over the clay mixing pad. Guinn brought 2 rolls of geotextile to be placed as the <br /> protective sheets under the plywood. <br /> Tuesday August 3, 1999 <br /> Guinn: Guinn continued to excavate and stockpile the wooded debris from the leachate impoundment pond <br /> area. Guinn is stockpiling the material over the clay-mixing pad. Guinn is utilizing 1-623, 1-633 scrapers, <br /> D4,D5 Cat dozers and the 140G grader to excavate and grade the pond area. The water truck continues to <br /> moisture condition the haul roads and all work areas. Guinn placed geotextile under the plywood and cover <br /> it with general earthfill on the eastern slope termination berm on top of cell WMU D-88. <br /> Wednesday August 4, 1999 <br /> Guinn: Guinn continued to excavate and stockpile the wooded debris from the leachate impoundment pond <br /> area. Guinn is stockpiling the material over the clay-mixing pad.Guinn utilized the excavator to remove a <br /> 62' section that contained several roots out of the western slope of the leachate impoundment. Guinn is <br /> utilizing 2-633 scrapers,D5 Cat dozer and the 140G grader to excavate and grade the pond area. The water <br /> truck continues to moisture condition the haul roads and all work areas. Guinn continued to place and <br /> compact general earthfill on the eastern slope termination berm. Guinn excavated the,materal placed over <br /> the southwestern Ashpit anchor trench plywood.. Guinn pulled the plywood up and placed geotextile material <br /> under it as per the plaits and replaced the vegetative cover material. <br /> Thursday August 5, 1999 <br /> Guinn: Guinn continued to excavate and stockpile the wooded debris from the leachate impoundment pond <br /> area. Guinn is stockpiling the material over the clay-mixing pad. Guinn is utilizing the 623, D5 Cat dozer <br /> and the 140G grader to excavate and grade the pond area. Guinn replace the material excavated from the <br /> western slope of the leachate pond with clean fill material. Guinn utilized the sheepfoot roller to compactor <br /> the material to 90%. Guinn completed the deployment of geotextile and placed protective cover on the cell <br /> floor. The water truck continues to moisture condition the haul roads and all work areas. Guinn unloaded 9 <br /> rolls of material that arrived from GSE. 1 roll 60 mil liner,3 rolls of geonet and 5 rolls of geotextile. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: 1.i- <br />