My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8-9-99 Weekly Field Report Job No. 986011.0', <br /> wFR No.14 VECTOR ENGINEERING, INC. Page No. lin <br /> Project Name: Client Or Owner: 14 <br /> Forward Land Fill Allied Waste <br /> Location(n Work: Owner°.s(k Client's Representative: Late: Day Of week: <br /> Manteca,CA Butch Stef ' Jr 8-09 99 TO 8-15-99 Mon Sun <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Grading Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Sandy clayey silt Partly Cloudy !'RANK DELL-ERA <br /> Cool <br /> Equipment used: <br /> Guitar: 14OG Grader,3-633/1-623 Paddle Wheels,D411 Cat Dozer,D5H Cat Dozer, 320L Cat Excavator,966D Cat loader,Water <br /> Tru.- CS 563C Cat Smooth Dram Roller. <br /> NOTES(Describe work completed during the day,any problems and heir solutions): <br /> Monday August 9, 1999 <br /> Guinn: Guinn had a change in construction managers today Duane Meadows left the site and Robert Burns <br /> arrived. Guinn continued to excavate and grade the leachate impoundment pond floor and slopes. Guinn <br /> utilized the 623 scraper to haul the material just to the north of the pond for future use as fill for cover on the <br /> liner. Guinn utilized the 140G grader to cut slopes and grade the 1%of flow towards the sump. <br /> Tuesday August 10, 1999 <br /> Guinn: Guinn continued to excavate and grade the leachate impoundment pond floor and slopes. Guinn <br /> utilized the excavator to cut the north west comer slope and the sump per plans. Guinn utilized the 140G <br /> grader to finish grade the pond floor to 1%of flow towards the sump. Guinn smooth drum rolled the floor. <br /> Guinn completed grading and track walking of the south slope Ashpit vegetative cover. The water truck <br /> continues to moisture condition the material for fill and all of the haul roads. Guinn rough graded the cell <br /> floor for the surveyors who are to be on site tomorrow in the a.m. <br /> Wednesday August 11,1999 <br /> Guinn: Guinn continued to excavate and grade the leachate impoundment pond floor and slopes. Guinn <br /> brought in 3 laborers to work on the pond slopes. Guinn excavated the trench for the lysimeter tubing. Guinn <br /> placed and covered the plywood underlined by geotextiie on the top deck west end,the berm on the south <br /> top and northern slope of the Ashpit. Guinn started to place the termination berm material on the northwest <br /> slope of the Ashpit. Dewalt did topo shoots on the Ieachate impoundment pond and the operation layer <br /> material. Dewalt also shoot the liner termination points. <br /> Thursday August 12, 1999 <br /> Guinn: Guinn completed excavation of the leachate impoundment anchor trench except where access is <br /> necessary. Guinn continues to place earthfill to construct the berm on the western edge of the Ashpit,the <br /> operations layer top of the Ashpit and around the sump tank. Guinn graded the cell floor. Guinn cleaned up <br /> wooded debris and geotextile roll cores from around the site. Guinn excavated around the sump tank in cell <br /> WMU D-98. Kleinfelder installed the 4 lysometers under the sump in the leachate impoundment pond. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Rvvie%ed by: !� <br />
The URL can be used to link to this page
Your browser does not support the video tag.