Laserfiche WebLink
8-9-99 Weeldy Field Report Job No. 986011.0` <br /> WR No.14 VECTOR ENGINEERING, INC. Page No. a/2 <br /> Friday August 13, 1999 <br /> Guinn: Guinn continues to place the operations layer material on the top of the Ashpit. The water truck <br /> continues to moisture condition all over the site. Guinn backfilled the lysometer trenches in the sump of the <br /> leachate impoundment pond. Guinn continues to construct the western berm and compact earthfill around <br /> the sump tank in cell WMU D-99. Guinn hand racked and rounded the trenches and slopes of the leachate <br /> impoundment pond. <br /> File Name:Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �� <br />