My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8-16-99 Weekly Field Report Job No.986011.0: <br /> WFR No.15 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Client Or Owner: 15 <br /> Forward Land Fill Allied Waste <br /> Location Of work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan Jr 8-16--99 To 8-22-" Mon-sun <br /> General Contractor: Liner Contractor. Proj. Engineer: Reviewed By. <br /> Guinn Construction GSE Scott Purdy <br /> General Foran Grading Contractor Superintendent Or Foreman: <br /> Robert Burns Dave Tuttle <br /> Source And Description Of Fill Material: Weather: CQA Technician frechnicim- <br /> Sandy clayey silt Clear Warm FRANK DELL-ERAUJIUS KING <br /> Equipment used: <br /> Guinn: 140G Grader,3-63311-623 Paddle Wheels,D411 Cat Dozer,D5H Cat Dozer,320L Cat Excavator, 966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller.GSE:John Deere 544E Loader,Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Monday August 16, 1999 <br /> Guinn: Guinn completed the placement of operations layer material on the top deck and southern berm of <br /> the Ashpit. Guinn welded the drop inlet for the leachate collection system and the 12"riser pipe for the sump <br /> in the leachate impoundment pond. Guinn continued to construct the bench berms and the western berm. <br /> GSE: GSE deployed GCL and the secondary liner system in the leachate impoundment pond. GSE deployed <br /> a total of 26 panels GCL totaling approximately 9,958ft. GSE deployed a total of 16 panels of 60 mil <br /> smooth geomembrane totaling approximately 9,558 112. All Panels were welded and airtested. <br /> Tuesday August 17, 1999 <br /> Guinn: Guinn continued to construct the bench berms and the western berm. Guinn finish graded the top <br /> deck of the Ashpit. Guinn constructed the northwestern berm of the Ashpit. <br /> GSE deployed GCL and secondary liner system in the leachate impoundment pond. GSE lined the sump area <br /> today. GSE deployed a total of 33 panels GCL totaling approximately 34,891ft. GSE deployed a total of 12 <br /> panels of 60 mil smooth geomembrane totaling approximately 34,839ft2. GSE performed repairs,vacuum <br /> tested and airtested all seams. <br /> Wednesday August 18, 1999 <br /> Guinn: Guinn completed construction of the bench berms on the eastern slope of the sump in cell WMU D- <br /> 99. Guinn placed the first lift of earthfill in the anchor trench around the Leachate impoundment pond in <br /> areas approved by CQA. Guinn utilized the excavator to compact the slope below the south roadway. Guinn <br /> started to push the material for the termination berm on the southern slope. <br /> GSE deployed GCL and secondary liner system in the leachate impoundment pond. GSE lined the sump area <br /> today. GSE deployed a total of 25 panels GCL totaling approximately 10,221fl. GSE deployed a total of 9 <br /> panels of 60 mil smooth geomembrane totaling approximately 13,248ft2. GSE performed repairs,vacuum <br /> tested and airtested all seams. <br /> Thursday August 19, 1999 <br /> Guinn: Guinn completed construction of the bench berms on the eastern slope of cell V;W D-99. Guinn <br /> continued to push and compact the material for the termination berm on the southern slope of cell WMU D- <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: US <br />
The URL can be used to link to this page
Your browser does not support the video tag.