8-16-99 Weekly Field Report Job No.986011.0: <br /> WFR No.15 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Client Or Owner: 15 <br /> Forward Land Fill Allied Waste <br /> Location Of work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan Jr 8-16--99 To 8-22-" Mon-sun <br /> General Contractor: Liner Contractor. Proj. Engineer: Reviewed By. <br /> Guinn Construction GSE Scott Purdy <br /> General Foran Grading Contractor Superintendent Or Foreman: <br /> Robert Burns Dave Tuttle <br /> Source And Description Of Fill Material: Weather: CQA Technician frechnicim- <br /> Sandy clayey silt Clear Warm FRANK DELL-ERAUJIUS KING <br /> Equipment used: <br /> Guinn: 140G Grader,3-63311-623 Paddle Wheels,D411 Cat Dozer,D5H Cat Dozer,320L Cat Excavator, 966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller.GSE:John Deere 544E Loader,Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Monday August 16, 1999 <br /> Guinn: Guinn completed the placement of operations layer material on the top deck and southern berm of <br /> the Ashpit. Guinn welded the drop inlet for the leachate collection system and the 12"riser pipe for the sump <br /> in the leachate impoundment pond. Guinn continued to construct the bench berms and the western berm. <br /> GSE: GSE deployed GCL and the secondary liner system in the leachate impoundment pond. GSE deployed <br /> a total of 26 panels GCL totaling approximately 9,958ft. GSE deployed a total of 16 panels of 60 mil <br /> smooth geomembrane totaling approximately 9,558 112. All Panels were welded and airtested. <br /> Tuesday August 17, 1999 <br /> Guinn: Guinn continued to construct the bench berms and the western berm. Guinn finish graded the top <br /> deck of the Ashpit. Guinn constructed the northwestern berm of the Ashpit. <br /> GSE deployed GCL and secondary liner system in the leachate impoundment pond. GSE lined the sump area <br /> today. GSE deployed a total of 33 panels GCL totaling approximately 34,891ft. GSE deployed a total of 12 <br /> panels of 60 mil smooth geomembrane totaling approximately 34,839ft2. GSE performed repairs,vacuum <br /> tested and airtested all seams. <br /> Wednesday August 18, 1999 <br /> Guinn: Guinn completed construction of the bench berms on the eastern slope of the sump in cell WMU D- <br /> 99. Guinn placed the first lift of earthfill in the anchor trench around the Leachate impoundment pond in <br /> areas approved by CQA. Guinn utilized the excavator to compact the slope below the south roadway. Guinn <br /> started to push the material for the termination berm on the southern slope. <br /> GSE deployed GCL and secondary liner system in the leachate impoundment pond. GSE lined the sump area <br /> today. GSE deployed a total of 25 panels GCL totaling approximately 10,221fl. GSE deployed a total of 9 <br /> panels of 60 mil smooth geomembrane totaling approximately 13,248ft2. GSE performed repairs,vacuum <br /> tested and airtested all seams. <br /> Thursday August 19, 1999 <br /> Guinn: Guinn completed construction of the bench berms on the eastern slope of cell V;W D-99. Guinn <br /> continued to push and compact the material for the termination berm on the southern slope of cell WMU D- <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: US <br />