8-23-99 Weekly Field Report Job No. 986011.0: <br /> WFR No.16 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Cheat or owner. 16 <br /> Forward Land Fill Allied Waste <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Weds: <br /> Manteca,CA Butch Stefan,Jr 8-23-99 TO 8-29-99 lion-Sun <br /> Geral Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Grading Contractor Superintendent Or Foreman: <br /> Robert Burns Rill Geary <br /> Source And Description Of Fill Material: Weather. CQA Technician: <br /> Sandy clayey silt Clear Hot, FRANK DELL-ERA <br /> Cloudy Cool <br /> Equipment used: <br /> Guinn: 140G Grader, 3-633/1-623 Paddle Wheels,D411 Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck GSE <br /> 544E John Deere loader, Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Monday August 23, 1999 <br /> Guinn: Guinn continued to place the first lift of earthfill in the anchor trench around the Leachate <br /> impoundment pond. Guinn dressed up the Ashpit by track walking the slopes. Guinn placed the cement slurry <br /> mix in the sump riser anchor trench and the anchor trench in the southwest corner of cell WMU D-99. The <br /> water truck continues to moisture condition all over the site. <br /> GSE: GSE deployed geonet on the floor, north and south slopes of the leachate impoundment pond. GSE <br /> deployed approximately 45,000ft2. All seams were tied with approved plastic ties. <br /> Tuesday August 24, 1999 0 <br /> Guinn: Guinn backfilled the anchor trench on the geonet around the Leachate impoundment pond. Guinn <br /> excavated and replaced the sump tank with a new tank in cell WNW D-98. Guinn placed new coarse drainage <br /> gravel around the tank. The tank is setting on gravel and wrapped with geotextile on the surface of the gravel. <br /> GSE: GSE completed deployment of the Geonet in the leachate impoundment pond. GSE deployed a total <br /> approximately 25'00ft2. GSE started deployment of the primary liner system in the leachate impoundment <br /> with a total of 20 panels of 60 mil smooth geomembrane totaling approximately 16,855ft2. A couple repairs <br /> were made to the secondary liner One at the anchor trench for the sump riser on the southwestern slope, A <br /> wrinkle was removed and a cap strip was placed and tested, a second repair of a wrinkle was made on the <br /> access ramp_ No repairs were made on the primary liner system_ <br /> Wednesday August 25, 1999 <br /> Guinn: Guinn back-filled and compacted the earthfill around the sump tank in cell WW D-98. Guinn <br /> backfilled the anchor trenches on the southern and western slopes of the leachate impoundment pond. <br /> GSE: GSE deployed a total of 37 panels of 60mil geomembrane for the primary liner system in the leachate <br /> impoundment pond. 27 panels were smooth and 10 panels were smooth white with black textured on the <br /> bottom totaling approximately 29,417ft2. No repairs were made today. All seams were welded and airtested. <br /> Thursday August 26, 1999 <br /> Guinn: Guinn backfilled and compacted the earthfill on the western slope of the leachate impoundment pond. <br /> Guinn installed the brackets for the force main header pipe and the sump riser support. Guinn set the brackets <br /> in concrete. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />