4. Coordination of schedules: <br /> A. Forward will complete subgrade for the ash pit by tomorrow. Forward is filling <br /> the area to the southeast of the ash pit with trash. <br /> B. Guinn suggested cutting some soil out of the leachate impoundment if there is <br /> a need for soil on the road along the south side of the ash pit. <br /> C. Forward thinks that they could have the trash and cover in the southeast side <br /> by the middle of next week. <br /> D. Guinn's surveyors can survey that area last. <br /> E. Scott will check to see if samples of HDPE have been sent to Vector for direct <br /> shear testing. Ben will obtain samples of clay admix for the direct shear <br /> testing next week. Guinn will complete survey on the ash pit by June 15. <br /> F. Guinn will finish clay on the 18tl" and survey results will be provided by the <br /> 24th. On the 28th, the floor will be ready for HDPE liner. <br /> G. GSE can start the slopes such that they are complete by the 28th and be <br /> ready for the floor. <br /> H. Scott will coordinate with GSE to schedule when GSE will arrive on-site. <br /> I. GSE can start as early as June 15 on the slopes and ash pit. <br /> J. The road along the south side of the ash pit will be ready for Guinn to work on <br /> by next Wednesday. <br /> Field s i s, problems, conflicts, and changes: <br /> A. Grain size testing by Vector on the drainage rock is failing the specifications. <br /> About 8% is retained on the 1-inch sieve and there is supposed to be 100% <br /> on the 1-inch sieve. Guinn will provide additional samples to Vector for <br /> testing. <br /> B. The first bench around the cell has aggregate base and chip seal on it about <br /> 1-foot thick. Guinn needs to remove this material. They need to maintain the <br /> same slope (2%) into the cell, but don't need to build it back. The surveyors <br /> can survey it before and after to get quantities. Vector will observe the <br /> removal of the material. Butch will provide a stockpile location to Guinn so <br /> that they can utilize the material. <br /> C. There is an existing leachate pipe in the south slope of cell 99. This should <br /> be cut out about 2 feet and soil placed and compacted back into the slope. <br /> D. The main leachate line along the west side of the cell will be cut and capped <br /> by Guinn. <br /> 6. Problems which impede the construction schedule and corrective measures: <br /> No problems impeding schedule. <br /> n:/986011.01/Weekly Progress Meetings/05-25-99 Meeting 1.doc Page 3 <br />