My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Review submittal schedules: 10 <br /> A. Vector handed out a submittal register and all parties reviewed the required <br /> submittals. <br /> B. For progress payments, Butch will check on internal review periods for Allied. <br /> Guinn will review progress payments with Ben and send to Scott. Scott will <br /> review and send the progress payment to Allied (Kevin Basso) for processing. <br /> Butch will let Scott know the submittal schedule date and Scott will contact <br /> Guinn. <br /> C. Scott will send a copy of the submittal register to GSE. <br /> D. Forward will place the geosynthetics just north of the leachate impoundment. <br /> E. Three copies of all submittals should be sent to Scott for approval. <br /> 8. Review of off-site manufacturing and delivery schedules: <br /> A. Scott will contact GSE with start date and let Butch know when material will <br /> be received. He needs to rent a forklift. <br /> B. Narco clay is on-site. <br /> C. Samples of gravel failed and need to be resubmitted. <br /> D. Butch can work with GSE to stockpile geosynthetics where they need to <br /> deploy it. <br /> i <br /> 9. Access issues: <br /> No issues. <br /> 10. Health and safety issues: <br /> A. Forward ran clean water through the leachate line along the west side of the <br /> cell prior to Guinn cutting and capping it. <br /> B. Guinn will hold weekly tailgate safety meetings. Minutes of these meetings <br /> will be provided to Forward. <br /> 11. Other items: <br /> A. Guinn will cut the anchor trenches for the geosynthetics. Guinn will add the <br /> anchor trench excavation to the schedule. <br /> n:/986011.01/Weekly Progress Meetings/05-25-99 Meeting 1.doc Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.