Laserfiche WebLink
PROGRESS MEETING NO. 2 <br /> MEETING MINUTES 611199 <br /> FORWARD, INC. LANDFILL <br /> Job No. 986011.02 <br /> Forward, Inc. Landfill: WMU D-99, Class 11 Leachate Impoundment, and Closure of <br /> Eastern Ash Pit and WMU Interim F <br /> To: Duane Meadows, Guinn <br /> Pete Keller, Allied <br /> Butch Stefani, Forward <br /> Ben Dell-Era, Vector <br /> cc: Kevin Basso, Forward <br /> Mike Kaiser, Allied <br /> Jeff Affonso, Guinn <br /> Tim Guinn, Guinn <br /> Sangeeta Lewis, Lewis Engineering <br /> From: Scott Purdy, Vector Engineering, Inc. <br /> Ank Subject: Weekly Progress Meeting Minutes, June 1, 1999 <br /> Attendees: <br /> Duane Meadows, Guinn <br /> Butch Stefani, Forward <br /> Scott Purdy, Vector <br /> ACTION ITEMS <br /> > Scott will contact Bonnie with Guinn regarding progress payments. <br /> > Scott will contact Butch with the schedule for liner placement. <br /> ➢ Guinn will submit new gravel samples to Vector for testing. <br /> 1 Comments from previous meeting: <br /> A. Guinn provided a copy of their contractors s safety declaration. <br /> B. Guinn provided a copy of their weekly safety meeting minutes. <br /> C. Duane Meadows' fax number on-site is: 209-234-2757. <br /> D. GSE will be sending samples of material for conformance and direct shear. <br /> E. Ben provided Scott with a bucket of the Narco/soil mix for direct shear testing. <br />