Laserfiche WebLink
Vector will submit it to CH2M Hill for evaluation. Once approval or rejection is <br /> made by CH2M Hill, Vector will respond to Guinn. <br /> 6. Problems which impede the construction schedule and corrective measures: <br /> No problems impeding schedule. <br /> 7. Review submittal schedules: <br /> A. Guinn submitted a revised construction schedule. <br /> B. Guinn submitted the Contractor's safety declaration. <br /> C. All submittals for Guinn will be handled from their main office in Bakersfield. <br /> 8. Review of off-site manufacturing and delivery schedules: <br /> A. Scott will let Butch know when GSE material will be arriving so that he can <br /> rent a forklift. <br /> B. Guinn will be submitting new gravel samples to Vector for testing. <br /> 9. Access issues: <br /> No issues. <br /> Health10. safety issues: <br /> A. Guinn submitted a copy of their weekly safety meeting minutes. <br /> 11. Other items: <br /> A. The excavation of the anchor trench was added to the construction. <br /> B. Scott will call Bonnie on progress payments. <br /> n:/986011.01/Weekly Progress Meetings/06-01-99 Meeting 2.doc Page 3 <br />