My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector will submit it to CH2M Hill for evaluation. Once approval or rejection is <br /> made by CH2M Hill, Vector will respond to Guinn. <br /> 6. Problems which impede the construction schedule and corrective measures: <br /> No problems impeding schedule. <br /> 7. Review submittal schedules: <br /> A. Guinn submitted a revised construction schedule. <br /> B. Guinn submitted the Contractor's safety declaration. <br /> C. All submittals for Guinn will be handled from their main office in Bakersfield. <br /> 8. Review of off-site manufacturing and delivery schedules: <br /> A. Scott will let Butch know when GSE material will be arriving so that he can <br /> rent a forklift. <br /> B. Guinn will be submitting new gravel samples to Vector for testing. <br /> 9. Access issues: <br /> No issues. <br /> Health10. safety issues: <br /> A. Guinn submitted a copy of their weekly safety meeting minutes. <br /> 11. Other items: <br /> A. The excavation of the anchor trench was added to the construction. <br /> B. Scott will call Bonnie on progress payments. <br /> n:/986011.01/Weekly Progress Meetings/06-01-99 Meeting 2.doc Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.