Laserfiche WebLink
PROGRESS MEETING NO. 3 <br /> MEETING MINUTES 6122199 <br /> FORWARD, INC. LANDFILL <br /> Job No. 986011.02 <br /> Forward, Inc. Landfill: WMU D-99, Class 11 Leachate Impoundment, and Closure of <br /> Eastern Ash Pit and WMU Interim F <br /> To: Duane Meadows, Guinn <br /> Pete Keller, Allied <br /> Butch Stefani, Forward <br /> Ben Dell-Era, Vector <br /> cc: Kevin Basso, Forward <br /> Mike Kaiser, Allied <br /> Jeff Affonso, Guinn <br /> Tim Guinn, Guinn <br /> Sangeeta Lewis, Lewis Engineering <br /> From: Scott Purdy, Vector Engineering, Inc. <br /> Subject: Weekly Progress Meeting Minutes, June 22, 1999 <br /> Attendees: <br /> Tim Guinn, Guinn <br /> Duane Meadows, Guinn <br /> Scott Purdy, Vector <br /> Ben Dell-Era, Vector <br /> ACTION ITEMS <br /> ➢ Scott will check with Sangeeta on LCRS pumping going up the slope in the <br /> southeast corner of the D99 Cell liner(detail F6). <br /> ➢ The surveyor will provide Vector with the clay liner as-built by Thursday or Friday of <br /> this week for review. <br /> ➢ Guinn will rake slopes and complete final grading. <br /> > Scott will check with Sangeeta concerning the fill around the LCRS tank to see if it <br /> can be reduced to prevent partial collapse. <br /> > Scott will talk to Allied concerning the abandonment of the monitoring well in the <br /> impoundment. <br /> > Guinn will review the submittal register and determine the status of any required <br /> submittals. <br /> > Guinn will adjust their construction schedule to reflect HDPE placement on Monday. <br />