My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Field observations, problems, conflicts, and changes: <br /> A. Along the ditch on the South side of the anchor trench, the seams were <br /> shingled up-slope instead of down-slope. In the trench area, GSE will trim <br /> the overlap off so that water can flow freely. <br /> B. GSE is fusion welding the geotextile component of the geocomposite <br /> because their sewing machines broke down. <br /> C. Moisture conditioning and reworking of some of the subgrade will be required <br /> due to desiccation. <br /> D. The LCRS gravel was delivered to the site with excess fines. That material <br /> was stockpiled separately and tested by Vector. It failed and Guinn is <br /> attempting to wash it. <br /> 6. Problems which impede the construction schedule and corrective measures: <br /> A. For the well abandonment, Vector needs to schedule a drill rig and set up the <br /> well abandonment. <br /> B. Butch will coordinate with Environmental Health. <br /> C. Guinn can begin excavation in the impoundment. <br /> 7. Review submittal sc ls: <br /> A. Guinn will update their construction schedule. <br /> 8. Review of off-site manufacturing and delivery schedules: <br /> A. The LCRS tank should be delivered by Friday at the latest. <br /> B. The extra roll of smooth HDPE should be delivered within a week. <br /> C. Guinn will be submitting on the piping for the impoundment. <br /> 9. Access issues: <br /> A. Butch will check on the status of the perimeter access road. Duane will check <br /> with Jeff and have him call Butch. <br /> 10. Health and safety issues: <br /> A. GSE shuts down the liner installation of the temperature gets too hot. <br /> 11. Other items: <br /> A. Guinn and Vector are reviewing the monthly pay estimate and will send it to <br /> Scott for review. Scott will send the approved progress estimate to Pete. <br /> n:/986011.01/Weekly Progress Meetings/07-13-99 Meeting 5.doc Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.