My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROGRESS MEETING NO. 6 <br /> 41 MEETING MINUTES 7/27/99 <br /> FORWARD, INC. LANDFILL <br /> Job No. 986011.02 <br /> Forward, Inc. Landfill: WMU D-99, Class II Leachate Impoundment, and Closure of <br /> Eastern Ash Pit and WMU Interim F <br /> To: Duane Meadows, Guinn <br /> Curt Fujii, Allied <br /> Pete Keller, Allied <br /> Butch Stefani, Forward <br /> Ben Dell-Era, Vector <br /> cc: Kevin Basso, Forward <br /> Mike Kaiser, Allied <br /> Jeff Affonso, Guinn <br /> Tim Guinn, Guinn <br /> Sangeeta Lewis, Lewis Engineering <br /> From: Scott Purdy, Vector Engineering, Inc. <br /> Subject: Weekly Progress Meeting Minutes, July 27, 1999 <br /> Attendees: <br /> Kevin Basso, Allied Waste <br /> Curt Fujii, Allied Waste <br /> Duane Meadows, Guinn <br /> Scott Purdy, Vector <br /> Ben Dell-Era, Vector <br /> ACTION ITEMS <br /> ➢ Scott will call Dale Geary of GSE concerning the additional roll of HDPE. <br /> Scott will call Dale Geary of GSE concerning the 5 additional rolls of geotextile. <br /> ➢ Vector will confirm that the conformance testing of HDPE for the impoundment is <br /> conducted and approved. <br /> Scott will contact GSE so that they can mobilize a crew to begin lining the <br /> impoundment on the 9th of August. <br /> Guinn will provide a cost estimate for installing a 20-inch CMP across the road to the <br /> south of the ash pit. <br /> ➢ Scott will talk to Sangeeta regarding ballast for the impoundment and alternatives to <br /> the tires. <br />
The URL can be used to link to this page
Your browser does not support the video tag.