Laserfiche WebLink
PROGRESS MEETING NO. 6 <br /> 41 MEETING MINUTES 7/27/99 <br /> FORWARD, INC. LANDFILL <br /> Job No. 986011.02 <br /> Forward, Inc. Landfill: WMU D-99, Class II Leachate Impoundment, and Closure of <br /> Eastern Ash Pit and WMU Interim F <br /> To: Duane Meadows, Guinn <br /> Curt Fujii, Allied <br /> Pete Keller, Allied <br /> Butch Stefani, Forward <br /> Ben Dell-Era, Vector <br /> cc: Kevin Basso, Forward <br /> Mike Kaiser, Allied <br /> Jeff Affonso, Guinn <br /> Tim Guinn, Guinn <br /> Sangeeta Lewis, Lewis Engineering <br /> From: Scott Purdy, Vector Engineering, Inc. <br /> Subject: Weekly Progress Meeting Minutes, July 27, 1999 <br /> Attendees: <br /> Kevin Basso, Allied Waste <br /> Curt Fujii, Allied Waste <br /> Duane Meadows, Guinn <br /> Scott Purdy, Vector <br /> Ben Dell-Era, Vector <br /> ACTION ITEMS <br /> ➢ Scott will call Dale Geary of GSE concerning the additional roll of HDPE. <br /> Scott will call Dale Geary of GSE concerning the 5 additional rolls of geotextile. <br /> ➢ Vector will confirm that the conformance testing of HDPE for the impoundment is <br /> conducted and approved. <br /> Scott will contact GSE so that they can mobilize a crew to begin lining the <br /> impoundment on the 9th of August. <br /> Guinn will provide a cost estimate for installing a 20-inch CMP across the road to the <br /> south of the ash pit. <br /> ➢ Scott will talk to Sangeeta regarding ballast for the impoundment and alternatives to <br /> the tires. <br />