My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. Comments from previous meeting: <br /> A. The additional roll of HDPE for the impoundment has not arrived on-site. <br /> Scott will call Dale Geary with GSE to determine the status. <br /> B. Kleinfelder abandoned the monitoring well in the impoundment. A <br /> representative of Environmental Health was on-site to observe the <br /> abandonment. <br /> 2. Review of work progress since previous meeting: <br /> A. The majority of the drainage material has been placed. Guinn is short about <br /> 355 tons of gravel. Guinn has worked out a credit with Granite for the <br /> contaminated gravel. It should be delivered this week. <br /> B. The ash pit has been completed. <br /> C. Most of the operations layer has been placed. <br /> D. The LCRS tank was delivered and placed. It still needs to be compacted. <br /> E. The monitoring well was abandoned in the impoundment. <br /> F. GSE completed all portions of the site to be lined (except the impoundment) <br /> and demobilized from the site. <br /> G. The burrito wrap along the south side of the ash pit has been completed. <br /> 3. Projected schedule: <br /> A. Gravel/LCRS will be completed this week. <br /> B. We need five rolls of geotextile filter layer prior to being able to finish the <br /> operations layer. After the textile arrives, the operations layer can be placed <br /> within one day. <br /> C. Guinn will begin excavation of the impoundment today. Guinn will be ready for <br /> GSE to place liner in the impoundment by the 9th of August. Scott will contact <br /> GSE so that they are ready to line on the ninth. <br /> 4. Coordination of schedules: <br /> A. Vector will contact GSE on lining the impoundment and the delivery of <br /> material. <br /> B. Forward will construct the leachate line to deliver leachate to the new pond. <br /> C. Vector will review conformance data on the impoundment liner with Precision. <br /> 5. Field observations, problems, conflicts, and changes: <br /> A. Guinn will provide costs to obtain and install a 20-inch CMP across the road <br /> on the south side of the ash pit. <br /> n:/986011.01/Weekly Progress Meetings/07-27-99 Meeting 6.doc Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.