My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. The plans call for a 4-foot perimeter berm around the tank. Guinn would like <br /> to taper the berm at a lower height to reduce the chance of tank collapse. <br /> That is acceptable to Vector. a <br /> C. The excavation material from the impoundment has some vegetation in it. <br /> This material can be used on the slopes of the ash pit as vegetative cover but <br /> not on the benches and road. <br /> D. Guinn needs to grub the top vegetation layer out of the impoundment prior to <br /> excavation. <br /> E. Guinn asked if there are any other options in the impoundment instead of the <br /> tire detail on sheet 15. Scott will talk to Sangeeta regarding other options <br /> 6. Problems which impede the construction schedule and corrective measures: <br /> A. Five rolls of geotextile need to be delivered prior to Guinn being able to finish <br /> placing operations layer on the floor of D-99. <br /> 7. Review submittal schedules: <br /> A. Guinn provided an updated schedule. <br /> B. The job should be complete by the week of the 16"' of August. <br /> C. Guinn still needs to place soil on the benches above the D-99 cell. <br /> 8. Review -site manufacturing and deliveryschedules: <br /> A. Guinn needs to submit on the 12-inch pipe for the impoundment. <br /> B. Guinn needs to submit on the suction lysimeter and who will put it in. <br /> 9. Access issues: <br /> None <br /> 10. Health and safety issues: <br /> None— Duane will provide copies of tailgate safety meetings to Butch. <br /> 11. Other items: <br /> A. Vector reviewed Guinn's monthly pay estimate and sent it on to Pete Keller. <br /> The estimate will continue to go to Pete and not Curt Fujii unless they decide <br /> otherwise. <br /> n:/986011.01/Weekly Progress Meetings/07-27-99 Meeting 6.doc Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.