Laserfiche WebLink
PROGRESS MEETING NO. 7 <br /> MEETING MINUTES 813199 <br /> FORWARD, INC. LANDFILL <br /> Job No. 986011.02 <br /> Forward, Inc. Landfill: WMU D-99, Class 11 Leachate Impoundment, and Closure of <br /> Eastern Ash Pit and WMU Interim F <br /> To: Duane Meadows, Guinn <br /> Curt Fujii, Allied <br /> Pete Keller, Allied <br /> Butch Stefani, Forward <br /> Ben Dell-Era, Vector <br /> cc: Kevin Basso, Forward <br /> Mike Kaiser, Allied <br /> Jeff Affonso, Guinn <br /> Tim Guinn, Guinn <br /> Sangeeta Lewis, Lewis Engineering <br /> From: Scott Purdy, Vector Engineering, Inc. <br /> Subject: Weekly Progress Meeting Minutes, August 3, 1999 <br /> Attendees: <br /> Butch Stefani, Forward <br /> Duane Meadows, Guinn <br /> Scott Purdy, Vector <br /> Ben Dell-Era, Vector <br /> ACTION ITEMS <br /> Guinn will provide costs for the additional lysimeters. <br /> ➢ Guinn will let Vector know when Kleinfelder will install the lysimeters. <br /> ➢ Scott will check with Sangeeta on the conformance testing of the additional <br /> geosynthetic materials. <br /> 1. Comments from previous meeting: <br /> A. Vector has ordered the additional rolls of geotextile and geomembrane from <br /> GSE. We are still waiting. Scott contacted Dale Geary to determine the <br /> status and he said the material will be delivered by tomorrow. <br />