Laserfiche WebLink
05/27/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 14 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 14 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan Jr. 5-27-99 Thusda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> On site sandy cla Clear Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck.Allied: 2- <br /> 300E Cat Rock Tracks,325 Cat Excavator,D8,D4 140G Grader,Smooth Drum Roller. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 9 total <br /> Allied Crew: 6 total <br /> Guinn Construction is excavating the southern edge of the cell,the eastern toe and the access ramp. Guinn <br /> has the D6R ripping the subgrade material. The grader is cutting the south 2:1 slope and grading on the <br /> stockpile. Guinn utilized 1-623/3-633 paddle wheels to excavate and haul the suitable material for the clay <br /> admixture stockpile. Guinn encountered some sandy material unsuitable for clay mix. CQA notified Guinns <br /> foreman who redirected the material to the unsuitable materials stockpile. Guinn utilized the excavator to <br /> clean gravel from the tie in by the toe of slope and the LCRS pipe. <br /> Allied Waste is placing garbage as subgrade fill on the southeastern slope with daily cover material on cell <br /> WMU D-99. Allied is compacting and trimming the top deck of the Ashpit. Allied is utilizing 2 rock trucks <br /> to haul subgrade material from the WMU B to the west slope for placement as subgrade material. Allied has <br /> the water truck moisture conditioning the subgrade material prior to the placement of the subgrade lifts. <br /> Allied is utilizing the D4 and the D8 to spread and compact the western slope of the Ashpit. <br /> Vector Engineering,Inc. Observed excavation and stockpiling of unsuitable materials for clay mixture. <br /> Shipped samples of GDM for permeability testing. Shipped samples of subgrade and vegetative cover <br /> material for large scale direct shear testing. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �S <br />