05/28/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 15 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Seq;Fnda <br /> nce No.: <br /> Forward Landfill Allied Waste 15 <br /> Location Of Work: Owner's Or Client's Representative: Date: Dayf Week: <br /> Manteca,CA Butch Stefan,Jr. 5-28-99 <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purl <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> On site sandy clay Clear,Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guinn. 140G Grader,3-633/1-623 Paddle Wheels,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,815FC <br /> Sh foot Co actor.Allied:2-300E Cat Rock Trucks 325 Cat Excavator D8 D4 140G Grader, Smooth Drum Roller. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 9 total <br /> Allied Crew: 4 total <br /> Guinn Construction is excavating the southern edge of the cell and the eastern toe. Guinn has the D6R <br /> ripping the subgrade material. The grader is cutting the south 2:1 slope and grading on the stockpile. Guinn <br /> utilized 2-633 paddle wheels to excavate and haul the material that is suitable for the clay admixture to the <br /> appropriate stockpile. Guinn started placing.75' of on site materials with.25' of clay material on the mixing <br /> pad area. Guinn will start the mixing on the first of June. Guinn reset eastern stakes in the old access <br /> roadway so the asphalt could be removed. <br /> Allied to continued to place garbage on the southeast edge of the eastern slope it cover material. <br /> Allied continued to construct the anchor trench area on the slopes southern edge of cell WMU D-99. <br /> Vector Engineering,Inc. Observed excavation and stockpiling materials for clay mixture. Augered several <br /> test holes to verify thickness of the subgrade material. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />