06/02/99 Construction Field Report Job No. 986011.06 <br /> DFR No. 17 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 17 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch St Jr. 6-2-99 Wednesda <br /> General Contractor: Liner Contractor. Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> On site sandy clay Clear,Warm FRANK DELL-ERA. <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,815F Cat <br /> Sheepfoot Compactor.Griffin:2 Water trucks,WR2500,RS650 mixers. Allied: 2 Rock Trucks,D8,D4, 14OG Grader, Smooth <br /> Drum Roller. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 9 total Dewalt Crew: 2 total Griffin Crew 4 total <br /> Allied Crew: 2 total <br /> Guinn Construction has Griffin soils stabilization on site mixing the clay with on site materials. Griffin has 2 <br /> mixers and 2 water trucks mixing the clay and on site soils. Griffin completed the clay mixture today. Guinn <br /> has the D6R ripping the subgrade material. The grader is leveling the clay mixing pad as each lift is <br /> completed. Guinn utilized 2-633/1-623 paddle wheels to haul the material approved for admix from the <br /> AML stockpile to the mixing pad. Guinn utilized the scrapers to haul the clay material to the mixing pad area. <br /> Guinn continued to excavate subgrade material from the cell floor and access ramp.Dewalt is on site <br /> performing topo on the Ashpit and the eastern slope of cell WMU D-99. It set cut stakes for the <br /> southern roadway. <br /> Allied Waste continued to place garbage on the southeast edge of the eastern slope with daily cover material. <br /> Allied is utilizing 2 rock trucks and the D4 to place and spread subgrade material to the east of the liner <br /> termination point. <br /> Vector Engineering,Inc. Observed excavation and stockpiling materials for clay mixture. CQA pulled <br /> several moisture samples on the clay mix. While setting cut stakes CQA noticed that the amount of cut <br /> would be into the Ashpit material and interfere with a concrete crawl space under the road also it could hit <br /> the liner at the west end of the road. CQA informed the owner and construction manager. Tim Guinn wanted <br /> to know if the south road could be moved to the north 1' so Guinn would not have to key in the slope. <br /> [File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: V5 <br />