06/03/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 18 VECT®R. ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 18 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca, CA Butch StefitniJr. 6-3-99 Thursday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> On site sandy clay Light Rain in A.M. FRANK DELL-ERA <br /> Cloudy,Cool <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck, 815F Cat <br /> S foot Com or. Allied:2 Rock Trucks,D4, 140G Grader,D8 Smooth Drum Roller. <br /> NOTES(Describe-work completed during the day,any problems and their solutions): <br /> Guinn Crew: 9 total Dewalt Crew 2 total <br /> Allied Crew: 2 total <br /> Guinn Construction excavating the access ramp and the cell floor. Guinn has the D6R cutting the northern <br /> slope of the access ramp on the southwest corner of WMU D-99. Guinn utilized 2-633/1-623 paddle wheels <br /> to haul the material to the appropriate stockpiles. Guinn set up the laser and started to cut finish grade on the <br /> cell floor. Dewalt is on site shooting the 40' elevation on the northern slope of the Ashpit and setting laser <br /> points and 3' off set stakes for the toe of slope around the cell. Dewalt set staking for the southern bench of <br /> WMU D-99. Guinn wheel rolled the clay stockpile with the loader to seal it. <br /> Allied Waste continued to place garbage on the southeast edge of the eastern slope with daily cover material. <br /> Allied cut the flow line towards the cells southeastern slope between the Ashpit and cell WMU D-98. <br /> Vector Engineering, Inc. Observed excavation and stockpiling of materials. CQA informed Tim Guinn that <br /> the clay admix stockpile needed to be sealed. CQA told Allied that the transition to the collection point in <br /> the southeast comer needs some fill along the northeastern comer of the Ashpit. Tim Guinn wanted an <br /> answer on how wide the bench was to be constructed on the north side of the Ashpit? (CQA explained 15' <br /> per detail I on sheet 8). CQA,Allied,Guinn had a meeting with Sangita Lewis on the cell phone about the <br /> southern roadway. Guinn will have there surveyors submit a detail for the road and Sangita will review it and <br /> approve or request changes. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: V <br />