Laserfiche WebLink
06/04/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 19 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 19 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr. 6-4-99 Friday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction I GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> On site sandy clay Partly Cloudy, FRANK DELL-ERA <br /> Cool <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,815F Cat <br /> SLeMfoot Com actor. Allied:2 Rock Trucks,D4, 140G Grader,D8,Smooth Drum Roller Water Truck. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 9 total <br /> Allied Crew: 5 total <br /> Guinn Construction continued to excavate material from the floor utilizing a laser to control grade. Guinn <br /> utilized 2-633/1-623 paddle wheels to haul the material to the appropriate stockpiles. Guinn is maintaining <br /> moisture on top of the clay stockpile with the water truck. Guinn started to cut the road base from the old <br /> road located on the bench on the east and south side of cells WMU D-99. Guinn excavated approximately <br /> 1.2' of base rock. Guinn did not complete the excavation of the old roadway. <br /> IV Allied a continued to place garbage on the southeast edge of the eastern slope with daily cover material. <br /> Allied is placing material on the Ashpit to construct the berm on the south top per a plan change. Allied <br /> ripped,moisture conditioned and compacted the area on top of the Ashpit and the area between WMU D- 88 <br /> and the Ashpit. <br /> Vector Engineering,Inc. Observed excavation and stockpiling of materials. CQA informed Allied that prior <br /> to placement of any material they needed to scarify and moisture condition the subgrade material on top of <br /> the Ashpit. Guinn resubmitted the coarse drain gravel from Granite this time. The sample was too small for <br /> the perm testing. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �S <br />