Laserfiche WebLink
06/07/99 Construction Field Report Job No.986011.0: <br /> DFR No. 20 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 20 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefam,Jr. 6-7-99 Monda <br /> General Contractor: Liner Contractor. Proi. Engineer: Reviewed By: <br /> Guam Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> On site sandy cla Clear Cool FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,815F Cta <br /> SLeSEfbot Com actor. Allied:2 Rock Trucks,D4 140G Grader,D8 Smooth Drum Roller Water truck. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total <br /> Allied Crew: 2 total <br /> Guinn Construction continued to excavate material from the access ramp and the cell floor utilizing a laser <br /> to control grade. Guinn is utilizing the excavator to clean the eastern slope along the northeast comer of the <br /> cell floor. Guinn utilized 1-633/1-623 paddle wheels to haul the material to the appropriate stockpiles. Guinn <br /> is maintaining moisture on top of the clay stockpile with the water truck. Guinn worked on the access ramp <br /> entering from the north west corner today. Guinn worked on the first bench above the cell on the removal of <br /> the road base material. <br /> Allied Waste continued to place garbage on the southeast edge of the eastern slope with daily cover material. <br /> Allied is compacting the subgrade material placed on top of the Ashpit to construct the berm on the south <br /> top. Allied compacted the subgrade material on the southern slope of cell WMU D-88 along the roadway. <br /> Vector Engineering,Inc. Observed excavation and stockpiling of materials. Tested compaction on the <br /> material placed to construct the berm and on the southern slope with all tests meeting the specified <br /> requirements. CQA informed Allied that there was some cracks in the subgrade on the eastern slope that <br /> needed repaired. <br /> 1 <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by. �S <br />