My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/08/99 Construction Field Report Job No. 986011.0: <br /> DFR No.21 VECTOR ENGINEERING, INC. Page No. l <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 21 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Ment CA Butch St ' Jr. 6-8-99 Tuesda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows :J <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> On site clay Clear Cool FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,815F Cat <br /> SLo foot Co or. Allied:2 Rock Truc D4, 140G Grader,D8,Smooth Drum Roller,Water truck. <br /> MONOMMOMMMA <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total <br /> Allied Crew. 2 total <br /> Guinn Construction continued to excavate material from the access ramp and the cell floor utilizing a laser <br /> to control grade. Guinn utilized the grader to windrow the material and 1-633/1-623 paddle wheels to haul <br /> the material to the appropriate stockpiles. Guinn is maintaining moisture on top of the clay stockpile with the <br /> water truck. Guinn worked on the access ramp and berm entering from the north west corner today. Guinn is <br /> utilizing the excavator and the 623 scraper to remove the road base material from the 1"bench above the <br /> cell floor and start the excavation of the LCRS channel and the sump. <br /> Allied a continued to place garbage on the southeast edge of the eastern slope daily cover material. <br /> Vector Engineering,Inc. Observed excavation and stockpiling of materials. Tested compaction on the cell <br /> floor subgrade with all meeting the specified requirements. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �C7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.