06/09/99 Constructi®n Field Report Job No. 986011.0,' <br /> DFR No. 22 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Client Or Owner: Daily Field Report STenWeNo.: <br /> Forward Landfill Allied Waste 22 <br /> Location Of Work: Owner's Or Client's Representative: Date: Dek: <br /> Manteca,CA Butch Stefani Jr. 6-9-99 Wednesday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purd <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> On she sandy clay Clear Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,815F Cat <br /> Stfoot CoMactor. Allied:2 Rock Trucks D4 14OG Grader,D8 Smooth Drum Roller,and Water Truck. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew. 8 total Dewalt Crew. total 2 <br /> Allied Crew: 2 total <br /> Guinn Construction continued to utilize the laser to control grade and the grader to windrow material on the <br /> cell floor. Guinn utilized 1-633/1-623 paddle wheels to haul the material to the appropriate stockpiles. Guinn <br /> is maintaining moisture on top of the clay stockpile with the water truck Guinn is utilizing the excavator and <br /> the 623 scraper to remove subgrade material from the excavation of the LCRS channels and the sump area. <br /> Guinn cut the LCRS pipes in cell WMU D-98 at the 450 pieces and capped them off. Guinn is placing and <br /> spreading clean subgrade material where the old road base material was removed. Dewalt is on site shooting <br /> the subgrade verification survey for the clay placement on the cell floor. Dewalt performed topo on the <br /> eastern portion of the southern road which completes the subgrade top. <br /> Allied is placing subgrade material on the southeastern slope over the daily cover material. Allied is utilizing <br /> an excavator to load 2 rock trucks with material from WMU B stockpile. Allied is spreading the material <br /> with the D8 and the D4. <br /> Vector Engineering, Inc. Observed surveying, excavation and stockpiling of materials. While checking the <br /> subgrade verification it was found that the southeastern comer was not at a true 2%but more like a 3.5%and <br /> rolled around the corner. Guinn would like to replace the extra fill with clay material rather than bring <br /> subgrade material and compact it. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: V S <br />