Laserfiche WebLink
07/08/99 Construction Field Report Job No.986011.0: <br /> DFR No. 43 VECTOR ENGINEERING, INC. Page No.212— <br /> Material Delivered. Total fe Delivered Total Delivered to Date <br /> HDT 60 mil 105,300 <br /> HME 60 mil 169,200 <br /> HST 60 mil 378,000 <br /> Geonet 711400 <br /> Geotextile 81,000 <br /> Geocomposite Single sided 210,000 <br /> Geocomposite Double sided 119,000 <br /> GCL 1415,800 <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �� <br />